Outstanding Achievements

  • Vietnam Weng On a power plant project

    The first phase of the Vung Ang power plant in Vietnam is located on the southeast coast of Hoing Province in the north central part of Vietnam, about 400 kilometers away from the capital, Hanoi. Vietnam Weng'an Power Plant Phase I Construction of two 600MW coal-fired units, the Department of Vietnam's first 600MW coal-fired power plant. The owner is Vietnam Oil and Gas Corporation (PVN). The general contractor was Lilama, Vietnam's South Machinery General Public Works. Zhejiang Power built a boiler island BOP subcontractors. May 2015 Both machines have been transferred to commercial operation.

  • Vietnam coastal power plant a project

    Vietnam's coastal power plant is located in Cha Rong province, southeast of Ho Chi Minh City in Vietnam, about 250 km from Ho Chi Minh City. Construction of two 622MW sub-critical coal-fired units in Vietnam's coastal power plant. The owner is Vietnam Power Company (EVN). Zhejiang Power Construction is responsible for project management. Two units handed over to commercial operation in January 2016.

  • Zhejiang Changxing Natural Gas Co-generation Project

    Zhejiang Changxing natural gas CHP project by the Zhejiang Provincial Electric Power Development Co., Ltd. investment construction, Zhejiang Power Construction project management. The project started in July 2012 with a installed capacity of 2 sets of 435MW (9F) gas-steam combined cycle units with a combined cycle efficiency of 58.44%, reaching the world advanced level. Annual generating capacity of about 2.75 billion kwh, the amount of steam available for up to 1.6 million tons. The project was put into operation in December 2013.

  • Huadian ZHubanshan natural gas power generation project

    The construction scale is 3 × 390MW 9F gas-steam combined cycle generator set. The project investors are China Huadian Corporation and Zhejiang Energy Corporation, and the owner is Hangzhou Huadian Banshan Power Generation Co., Ltd. Zhejiang Electric Power Construction Co., Ltd. to manage the entire project management services. The project started in March 2004 and the three units were handed over to production in July 2005, November 2005 and December 2005 respectively. Three units won the 2006 Zhejiang Provincial Construction Project "Qianjiang Cup", 2006 Power Industry Quality Project Award and 2006 National Silver Award for Quality Project.

  • Zhejiang Tongbai Pumped Storage Power Station Project

    Tongbo Pumped Storage Power Station is a World Bank loan construction project and is a daily regulated pure pumped storage power station with an installed capacity of 4 × 300MW. The project was managed by Zhejiang Electric Power Construction Co., Ltd. The project was started in May 2000 and four units were put into operation in December 2005, October 2006, December 5, 2006 and December 27, 2006 respectively .

  • Zheneng Liuheng Photovoltaic Power Generation Project

    Covering an area of about 440,000 square meters and with total investment of RMB250 million, Zheneng Liuheng photovoltaic power generation project has the construction capacity of 33MWp. After putting into operation, the project can produce clean energy of 31.237 million KWh per year, which could meet about 30% of the electricity requirement for Liuheng Island during the daytime, thus saves about 9527.29 tons of standard coal, reduces 254.2692 million tons of carbon dioxide, 193.67 tons of sulfur dioxide and of 65.60 tons of nitrogen dioxide emissions. And more, water resources emissions are significantly reduced. Photovoltaic power generation drives the optimization of surrounding industries, obtains ecological economic benefits, further promotes the green energy to serve for the people.ZEPC, as the EPC general contractor, is responsible for design, procurement, construction and commissioning of the project.The project was completed on May 31, 2017 and handed over for commercial operation.